- With the preparation phase completed, the development cycle is next.
- This consists of three steps: Feature selection, Rapid Development and Variable Approach.
- The current section explains the first development cycle during the design.
- The end-effector is the feature that is selected in the first cycle.
- The implementation of the end-effector was not successful, as the design was too complex.
- Fortunately, this failure did give valuable insight on the design method.
-
- \subsection{Feature Selection}
- \begin{table}[]
- \caption{Overview of the different features and their dependencies, number of tests that can be completed and the risk/time factor.
- The risk/time factor is calculate as risk divided by time.}
- \label{tab:firstfeatureselection}
- \begin{tabular}{|l|l|l|l|l|l|}
- \hline
- Feature & Dependees & Tests & Risk & Time & Risk/Time \\ \hline
- SCARA & - & 3 & 40\% & 10 days & 4 \\ \hline
- End-effector & SCARA & 2 & 60\% & 8 days & 7.5 \\ \hline
- Carriage & - & 2 & 30\% & 10 days & 3 \\ \hline
- \end{tabular}
- \end{table}
- The feature is selected according to the feature selection step, explained in \autoref{sec:feature_selection}.
- For each component in the system the dependees, tests and risk/time factor is determined.
- These values are combined into \autoref{tab:firstfeatureselection}.
-
- %%%%%Euhm, ja dat staat dus niet in het initial design.
- The SCARA is dependent on the end-effector, as was explained in the initial design.
- However, for the carriage no dependency was defined even though it has to lift the other two components.
- This is mainly because the behavior of the SCARA changes depending on the end-effector, resulting in a possible design change.
- For the carriage it only changes the mass that has to be lifted.
- Upgrading the motor torque is a minor parametric change and the dependency is therefore insignificant.
-
- The testing number is directly the number of tests that can be completed by implementing that single component.
- For the risk and time it was a engineering judgement and no specific protocol to determine the values.
- The estimated risk is high for the end-effector due to the collision dynamics of the operation.
- It has to grab something and that is difficult to model. Furthermore, it was not known if that design would work.
- The SCARA has the most moving parts, but no difficult dynamics and has therefore an estimated risk of medium.
- For the carriage the there was no real risks and got therefore a low risk indication.
-
- The SCARA would be implemented first based on number of tests, but is dependent on the end-effector.
- Beginning with the end-effector is an obvious choices.
- It unlocks the SCARA and has the highest risk/time factor.
-
- \subsubsection{Evaluation}
- This first step of the detail design phase did go well.
- A more refined method for this step could be very useful.
- But the risk and time assessment will probably always be a engineering judgement from the developer.
- Within a design team a form of planning poker\footnote{\url{https://en.wikipedia.org/wiki/Planning_poker}{Wikipedia entry: Planning Poker}} could be a good option.
-
- \subsection{End-effector model}
- The end-effector will operate as an interface between the SCARA and the different tools.
- For that it has to be able to grab and release the tools.
- The initial design is shown in \autoref{fig:gripper}.
- With only some experience in modelling with collisions the decision was made to try to make some collisions in the 20-sim 3D mechanics editor.
- Unfortunately, collisions in a 20-sim model are difficult.
- There is little tooling available and there are no debugging options if the model does not behave as expected.
- The marker kept falling trough the gripper or flew away.
- With the small amount of progress made in two days the implementation was not promising.
- A crash in the software caused the model to corrupt, where the complete configuration of the shapes and their collisions was lost.
- Therefore it was decided that end-effector would be removed from the design.
-
- With the end-effector removed, the SCARA will get a direct connection with the marker.
- The lifting of the marker will be included in the SCARA as well.
- Furthermore, this means that the wiping will no be possible via the SCARA.
-
- \subsubsection{Evaluation}
- The lost progress of the model is unfortunate, but the implementation did not go expected anyway.
- It was probably for the best as it forced an evaluation of the design and avoided a tunnel vision while trying to get it to work.
- However, it did show the value of the risk/time analysis.
- This early failure resulted in changes for other components.
- But as none of the components were implemented yet, no work was lost.
|