@@ -2,7 +2,7 @@ |
|
|
|
As the previous development cycle was aborted prematurely, the development cycle is repeated for the next feature. |
|
|
|
|
|
|
|
\subsection{Feature Selection} |
|
|
|
The implementation of the end-effector proofed to be impractical. |
|
|
|
The implementation of the end-effector proved to be impractical. |
|
|
|
This means that only two features are left. |
|
|
|
\autoref{tab:featurestab2} shows an updated feature comparison. |
|
|
|
Compared with the previous feature selection in \autoref{tab:firstfeatureselection}, the number of tests for the SCARA decreased and the Risk/Time increased. |
|
|
|
@@ -77,7 +77,7 @@ |
|
|
|
It consists of the forward and inverse kinematics of the design. |
|
|
|
With this kinematics model it was easy to find a good configuration of the SCARA. |
|
|
|
I tested if the SCARA could reach the required operating area, to be able to satisfy specification \ref{threecharspec}. |
|
|
|
The operating area is not a couple of centimeters away from the base of the SCARA. |
|
|
|
The operating area is a couple of centimeters away from the base of the SCARA. |
|
|
|
This is to avoid the singularity point that lies at the base of the SCARA. |
|
|
|
Resulting in longer arms than strictly necessary but this reduces the operating angles of the joints allowing for simpler construction. |
|
|
|
|
|
|
|
@@ -131,9 +131,9 @@ |
|
|
|
|
|
|
|
Due to the aborted implementation of the end-effector, the SCARA must also lift the marker of the board. |
|
|
|
The chosen configuration of the SCARA makes it possible to add an extra joint in the linkage. |
|
|
|
As the marker only needs to be moved a couple of millimeters from the board, a simple servo suffices. |
|
|
|
As the marker only needs to be moved a couple of millimeters from the board, a simple hobby servo suffices. |
|
|
|
|
|
|
|
\subsubsection{Implementing details} |
|
|
|
\subsubsection{Advanced Detail Design} |
|
|
|
The new concrete design decisions, make it possible to plan the next steps of adding detail. |
|
|
|
The following steps are an addition to the steps as described in the previous section: |
|
|
|
\begin{enumerate} |
|
|
|
@@ -186,7 +186,9 @@ |
|
|
|
\subsubsection{Evaluation} |
|
|
|
The complete development was rather smooth. |
|
|
|
However, this was not without deviating from the original design plan. |
|
|
|
The different levels of detail could not be defined before the start of the development but had to be updated midway. |
|
|
|
It was not feasible to define all different levels of detail before the start of the development. |
|
|
|
Prior to the design, it was possible to plan 4 levels of detail. |
|
|
|
After these steps, the design decisions taken made it possible to define the following levels of detail. |
|
|
|
|
|
|
|
In total there are seven predefined levels of detail in the design. |
|
|
|
Meaning that there must also be seven test cycles. |
|
|
|
|