@@ -30,16 +30,14 @@ Many publications give credit to \textcite{royce_managing_1970}, for the concept
Where they refer to the simple 5 to 8 step design concept, similar to the one in \autoref{sec:SE}.
What these publications fail to address is that \textcite{royce_managing_1970} says: "I believe in this concept, but the implementation described above is risky and invites failure."
Followed by multiple steps of improving the waterfall model.
Royce adds a complete design step, loads of intermittent testing and documentation, and a literal instruction "Do it twice".
With "Do it twice", he adds an extra 6 steps to develop a prototype parallel to the simple waterfall model, with the goal to spot every unforeseen requirement prior to any actual development.

Interestingly, the mentioned problems that \textcite{royce_managing_1970} is providing a solution for, are similar to the difficulties in this case study.
Studies and publications about the waterfall model would have been far more relevant if the authors included Royce's improvements.
Especially as Royce explains that in his experience, the method without his improvements has never worked and that recovery costs far exceeded the added cost of the proposed improvements.
I expect that these improvements would have had a significant impact on the design process.



Royce adds a complete design step, loads of intermittent testing and documentation, and the instruction to "Do it twice".
On initial thought this feels as a disproportionate amount of extra work.
Especially since the current design plan already includes small feedback cycles.
However, the small feedback cycles only apply to the current design, and do not provide information about the current design direction.
Thus, the current level of detail might work, passing the tests of the current cycle does not guarantee a successful implementation of the design.
Based on the evaluation, it was often difficult to justify the design decisions as there was insufficient information.
A simple proof of concept would improve the information about the direction of the design, required resources and the feasibility of the project.
Although this requires additional work, it is very likely that it improves the projects feasibility and thus reducing the risks of the project.

\section{Development Cycle}
\subsection{Design and model}